PEC Case Study
RG Carter Ltd (Cambridge).
The cantilevered staircase pictured below was a project Playle Engineering undertook in March 2011 for RG Carter Ltd (Cambridge).
The contract consisted of structural and architectural metal work with an order value of £180,000.
The largest element was a feature stair to the main entrance and atrium which required a high degree of finish and detail, achieved by working with consistent care and skill through the fabrication design drawings, fabrication and final installation. The stair was made in 3 units weighing up to 4 tonnes each which were lowered through the roof of the building and hung cantilevering from the concrete frame.